Case Study: Omega Air desiccant dryer in Oil Rig
Omega Air desiccant dryer installation in Oil Rig Back in February, an oil rig docked in Scotland experienced issues with a Parker 250 bar desiccant dryer, as key components had become obsolete. Hollingworth Design challenge was to specify a suitable replacement that required minimal alterations to the existing plan. Although the rig operated on an…
